Calculating the cost of strategy – An orgtology perspective

Costing Strategy - An Orgtology Perspective

Using orgtology to cost a strategy differs from other costing models, such as e.g., the balanced scorecard. In orgtology, operational activity and strategic programs are the two core cost centres of Org. Their relationship is interdependent and not linear. They function independently as dual parts of the same entity. The one ensures performance, wh...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Orgtology Against The Rest: A comparison of the Orgtology Organizational Analysis Model against the Scientific and Bureaucracy Analysis Models

Orgtology in the future

 ABSTRACT The continuous bloodbath of organizations is not only a problem facing company executives but also world economies at large. This may be pointed to the dynamic nature of the market landscape as well as the constantly changing customer demands. Also, the fact that business is not a straightforward science makes the issue of choosing a...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Work breakdown structure for strategic programs

Workbreakdown structure for strategic programs - an orgtology perspective

A work breakdown structure (WBS) is a detailed plan on how to execute an intent. WBS's are used in project management. We do not use the term in process management because there we work with cyclic flow. In projects we must get things done as quickly as possible. With processes it is more about increasing the efficiency of cycle times. That is why ...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Defining Strategic Effectiveness - an Orgtology Perspective

Strategic Effectiveness - an Orgtology Perspective

Strategic effectiveness begins by knowing what to change. This is a complex process of understanding both a current reality and a desired state. Its not just about changing. Firstly, it is about knowing where we are. Secondly it is about knowing why we want to change. Thirdly it is about what must change. Lastly, it is about whether we are strong e...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

The Art of Strategic Thinking

Strategic Thinking - An Orgtology Perspective

Strategic thinking is the art of keeping an organisation relevant. For Org to survive it needs strategic thinkers within its executive team. They are the guardians of relevance. Therefore, they must understand the flow of strategy well. The structure of strategy begins as a flow. Purpose is the foundation of any organisation. Without it, Org cannot...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Optimizing Operational Efficiency

Optimizing Operational Efficiency - An Orgtology Perspective

Efficiency is the corner stone for any operation. Without it, Org will not survive. In nature, efficiency defines the cycle of life. Resources are never infinite. Therefore, the goal is always to decrease energy whilst increasing the result. To watch the incredible power of an ant or the precision of a honeybee will show the efficiency in nature. O...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

The REET Analysis

ROET Analysis - An Orgtology Perspective

Understanding is the foundation of change. Before we can improve, we must understand. REET stands for Relationships, Effectiveness, Efficiency, and Threats. The main purpose of REET is to understand the reality of a team or organisation. From such understanding one can make informed decisions regarding change and maintenance. I have been using REET...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Developing a business model

Developing a business model - an orgtology perspective

One of the aims of a model is to create a simplistic understanding of something. An architect will create a model to visualise an end-result. A mathematician could create a model to ease calculations for others. For organisations, we create a business model to show how we do our business. Stewart and Zhao (2000) see a business model as a statement ...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Defining the organisation and creating its identity – strategy from an orgtology perspective

Organisational definitione and identity from an orgtology perspective

The first phase of any strategic process must always be to know who we are and then to decide what we want to do with that. The strategic process thus begins with an understanding of purpose and intent. E.g., there are many boxers in the world and they all participate in a sport that hold the same rules. They thus operate on a similar algorithm. Th...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

The strategic process – an orgtology perspective

The strategic process – an orgtology perspective

To succeed, any organisation must thrive in a fast changing and dynamic world. The effect of this is that strategy must be intelligent and dynamic. It might be that much of what you know about strategy is obsolete. Research shows that old ways of creating corporate strategy will not sustain the growth and change that many organisations need. Orgtol...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Orgtology Q & A

Questions and answers about orgtology

On first acquaintance, orgtology might seem like a new name for old shoes. This is not the case, since orgtology has specific assumptions about organisation. These differ significantly from traditional organisational thinking. Executives who use orgtology as management tool, find it impossible to revert to traditional methods. Below is a podcast in...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Change Management – an orgtology perspective

Change is what makes life possible. The human ability to create intent beyond purpose is what sets us apart from the normal evolutionary change that occur in other animals. I.e., we can be revolutionary. E.g., a hawk can choose to catch a rabbit or a mouse, but it cannot choose to become a vegetarian. The hawk's choice is locked into its purpo...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

RUN THE BUSINESS AND CHANGE THE BUSINESS FOR SUSTAINED SUCCESS, AN ORGTOLOGY LENS

1. Abstract Sustained success is achieved if leadership establish the delicate balance between seeking optimum efficiency from running operations through business processes and executing projects to change the business at the right time to adapt to external factors. This is to ensure the organization remains a relevant member of its ecosystem. Stro...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

The effect of culture on organisational design

The effect of culture on organisational design - an orgtology perspective

The purpose of organisational design is to create order. Yet too much order will drive predictability, which might blind us to a fast-changing world. To change, Org must be creative. Organisational culture will decide how much uniqueness we allow within Org. We need uniqueness for abstract thinking. It keeps us relevant. In so, we need order to eff...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Orgotology practice as a panacea to challenges posed by 4IR to leaders and managers of 21st organizations. : Shaping a New Era

 Abstract  Blurred boundaries between man and machine, autonomous machines performing tasks and operations, digitization and integration of value chains, human 2.0. etc. The Fourth Industrial Revolution (4IR) is not only on our front porch but is in our living rooms. In the last two decades, our world has been a consequence of c...

Continue reading

Developing an organisational organogram – an orgtology perspective

Creating an Organogram - an Orgtology Perspective

To create an organogram from an orgtology perspective differs from traditional methods. Here our task is to first understand the flow of activity before we add resources and authority. We must at all times ensure efficiency. Not only regarding resources, but also in terms of process flow. We cannot assume that people who hold similar &nbs...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Integrating the Process and Project Constructs

The process construct is a blueprint for running the operations of Org. A project construct defines the plans that we make to change Org. The former ensures performance whilst the latter secures relevance. Process and project constructs must therefore give an integrated solution to the performance and relevance of Org. We cannot understand these co...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

APPLICATION OF THE ORGTOLOGY THEORIES TO CREATE AND MAINTAIN RELEVANT AND SUSTAINABLE ORGANISATIONS

Introduction  This descriptive and referenced essay intends to demonstrate the understanding of the philosophy, Hypothesis 2x of Orgtology, which is defined as the study of organisations (Hendrikz 2020), and its practical applicability to establish and maintain a relevant and performing Organization (Org). The Org. in question must be a going ...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

MEASURING RELEVANCE IN AN ORGANISATION: THE ORGTOLOGY PERSPECTIVE

Measuring Relevance in an Organisation: Orgtology Perspective

Introduction  Orgtology is a study of organisation and the consciousness that constructs it (Hendrikz 2020). It is a scientific study of how to run and change an organisation. In essence, it is a scientific study of how to ensure performance and secure relevance of an organisation. Thus, orgtology provides a unique perspective to understanding...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Leadership versus Management: An Orgtology Perspective on the Roles of a Coach and Captain During the 90+ Minutes in a Soccer Match

Stephen Keshi, coaching Nigeria at World Cup 2014. He was known as the 'Big Boss'.

Introduction and Research Questions  Who leads and who manages between the beginning and final whistles of the referee in soccer? Does the coach lead and the captain manage? Or, does the coach manage and the captain lead? Is it simple to discern the two roles during a match? If there is complexity, can we clearly define and understand the role...

Continue reading

Sameness and Difference – the core of Workplace Diversity and Inclusion – an Orgtology perspective

Workplace Diversity and Inclusion - an Orgtology Perspective

I am Caucasian, male, 52 years old, and speak with an Afrikaans accent. It is my fixed identity. Physically I cannot be anything else than that. Yet mentally I can be an incredible variety of that. My body is an algorithm. It restricts me. My mind is abstract. It frees me. Jointly, they become an expression of who and what I am. As humans we expres...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Corporate Governance: from an Orgtology Perspective

A Shift in Thinking

INTRODUCTION  Across the globe, the catchphrase in organizations is 'corporate governance'. Undoubtedly, 'corporate governance', is widely known for organizational achievement. It is associated with successful organizations. While the mentioning of 'corporate governance' represents excellence and reputation, critics however, believe it is just...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Organisational design – a future perspective.

Introduction to Organisational Design - An Orgtology Perspective

Without Organisations we would be primitive. It is through Org that we can control things and people. Religion, politics, philosophy, ideology, culture, business, and government… These are all organisations. Even language is an organised expression. Org gives humanity its collective consciousness and holds its intelligence beyond physical form. In ...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Theory Dx – The Relevant and Performing Individual (RPI)

Orgtology Theory Dx of the Relevant and Performing Individual.

To perform one must manage, whilst to be relevant one must lead. In so, a relevant and performing individual (RPI) is one who knows how to manage and lead. "On deciding when to manage and when to lead, take note of the following: A football coach is mostly never on the field, whilst the captain always is; The coaches work never stops, whilst the ca...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Theory Ex on Identity

Orgtology Theory Ex on Identity

"What makes us different, and in which ways are we the same? What incites our conflicts, for there are so many to blame...I want to be me yet cannot survive without we...But what then is left of me if I must crucify myself unto a collective we?Thus, the question remains - who am I and who are we? Derek Hendrikz: 2013 The basic assumption on Theory ...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Theory Px on Paradigm

Orgtology - Theory Px on Paradigm

A paradigm is the window through which one views the world. In so, it defines the reality of mind. To grasp a paradigm means understanding the thoughts and emotions that drive behaviour. In so, the problem is mostly not with a person, but with the belief construct that drives such person. In my experience, the secret to changing people is that you ...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Using Orgtology Theory to Create and Sustain Relevant and Performing Innovation-Based Organisations

 Introduction Orgtology is a study of organisation (Org) and the consciousness that constructs it. It is also defined as the science of organisation. (Hendrikz 2020) In developing an understanding of an organisation through Orgtology, one can then come up with solutions to help the organisation exist more optimally in both performance and rele...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Theory Ix on Intelligence

Theory Ix on Intelligence - Orgtology

To define intelligence is no simple task. There is no unchallenged definition to date. To put that in perspective, we have a better understanding of the universe than we do of intelligence. In fact, scientist have more math on parallel universes than they have on intelligence. In orgtology, we look at how people apply themselves in diverse situatio...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

What is Orgamatics?

Introduction to Orgamatics

Orgamatics is an orgtology field of study where one uses scientific method to create strategy and ensure operational efficiency. The term blends the two words, "organisation" and "mathematics". In so, it denotes the mathematical construct of an organisation. The basic assumption of orgamatics Through the study of organisational duality, we can unde...

Continue reading

Copyright

© Derek Hendrikz: 2021-12-26

Hypothesis 2x – the Foundation of Orgtology

Hypothesis 2x - the Foundation of Orgtology

Hypothesis 2x opens the study of orgtology. It creates its theories and philosophy. Its basic premise is that an Organisation can only exist if activity interacts. In so, an organisation exists through relations and relationships. To relate, entities must interact. Interaction is a cycle of projecting and receiving. When this happens, activity beco...